Hotel Sustainability

by Hotel Development Guide – Darren Blanchard
Last Updated: November 2026

Hotel sustainability begins with decisions about where to build, what to build and how the hotel will operate. The number of guestrooms, the size of public areas, and the inclusion of facilities such as pools, restaurants, spas, and laundries all affect the resources a hotel will need throughout its life. These decisions also influence working conditions, demand on local infrastructure, and the hotel’s contribution to the surrounding economy. By the time a property opens, many of its most significant sustainability outcomes have already been shaped by the development brief.

Sustainability is a source of disruption because it can change which hotel projects are viable, what an owner needs to invest in and how a property competes for business. Limited water or electricity capacity may require a different concept, while a brand, lender or corporate travel buyer may ask for evidence of environmental performance. Existing hotels face similar decisions when a plant reaches the end of its life, a new operator sets its property requirements, or an owner prepares the asset for sale. The implications extend across development, operations and asset management, with different parties often responsible for the investment and the outcome.

Why Sustainability Is Changing Hotel Development

Hotels use resources through a combination of guestrooms, kitchens, laundry, meeting spaces and leisure facilities, each with its own operating pattern. A coastal resort may reach full occupancy during the driest months, while a city hotel may have several large functions running on the same day. Annual consumption helps establish the overall cost and impact, but peak demand can determine whether the site can support the proposed development. Feasibility should therefore consider when demand occurs, how it will be met and what happens if the expected supply is constrained.

The owner should identify which requirements apply to the project and their sources. Planning or building requirements, brand standards, financing conditions, and voluntary certification can all affect the design brief, but they may require different actions and evidence. Corporate travel and event buyers may also request hotel-level carbon or water data, so a reporting capability can have a commercial use after opening. Physical exposure to heat, flooding or water scarcity should be reviewed alongside these issues and is discussed separately in Climate Change in Hotel Development.

Setting Sustainability Targets Before Design Begins

A sustainability brief should translate broad ambitions into decisions the project team can test. A water target, for example, should say which facilities it covers, what level of occupancy it assumes and whether it applies to annual use, peak demand or consumption per occupied room. The same principle applies to energy, construction materials and waste. When the owner changes the room count, adds a restaurant or increases the area of conditioned space, the feasibility and design teams should be able to show what that decision does to the targets.

For an operating hotel, utility bills, meter readings, and maintenance records can establish a baseline, provided the team understands how the hotel traded during the period. A new development will initially rely on design estimates and assumptions about how the building will be used. In a conversion, historic figures need to be interpreted in light of the previous use, since an office or residential building may have a very different demand for hot water, ventilation and servicing. Each target should have a stated baseline, a reporting unit, a person responsible for it, and a review date.

Considering People, Planet, Place and Prosperity

The World Sustainable Hospitality Alliance’s Pathway to Net Positive Hospitality uses four themes: people, planet, place and prosperity. Its broader ambition is for hospitality businesses to contribute positively to the destinations in which they operate. A developer can use the four themes to identify questions that a brief focused on building efficiency might overlook. These include how the hotel affects employees, nearby communities, natural habitats and the local businesses that may supply it.

At a coastal resort, this might mean examining water demand during the peak season alongside the condition of surrounding habitats, arrangements for seasonal staff and opportunities for local procurement. At a city conversion, the more immediate issues might be retaining parts of the existing building, improving staff facilities and managing deliveries near residential uses. The owner can then decide which issues need a change to the concept, which belong in the capital budget and which require an operating commitment. For an existing hotel, the Alliance’s progress tracker can help the team establish its starting point before it agrees on priorities.

Designing, Converting and Refurbishing Hotels

Early design decisions determine much of the demand that engineering systems will have to meet throughout the hotel’s life. Orientation, shading, glazing and the amount of conditioned space all affect heating and cooling requirements, while the location and scale of kitchens, laundries and leisure facilities shape utility loads and the space needed for plant. The design team should compare options while the building layout and schedule of facilities can still change. Space for maintenance access, equipment replacement and separate metering should be considered at the same time, while it can be incorporated without reworking the design.

At an existing hotel, the starting point is the work required to keep the property operating and bring it up to the intended standard. Where a boiler, chiller, or laundry machine already needs replacing, the investment decision can often be based on the additional cost of a higher-performing alternative over a standard replacement. The owner also needs to assess whether work can be phased, which facilities will have to close and what contribution the hotel may lose during the works. This can change the preferred timing, particularly where a seasonal closure or a planned refurbishment creates an opportunity to complete several packages together.

Operational Energy and Embodied Carbon

Operational energy is the energy used to run the hotel. A useful model reflects how the property actually operates, including restaurants that serve local customers, meeting rooms with uneven demand and facilities that continue to run when guestroom occupancy is low. It should also examine how systems interact, such as whether heat recovered from cooling equipment is available when the hotel needs hot water. Commissioning and meter requirements should then be written into the project specifications so that performance can be investigated after opening.

Embodied carbon refers to emissions associated with materials and construction and, depending on the scope of the assessment, maintenance, replacement and end of life. When comparing conversion with redevelopment, the owner should establish what can realistically be retained, what strengthening or adaptation would be needed and how each option is expected to perform in use. The frequency of refurbishment also matters in a hotel, where finishes and furniture may be replaced several times during the life of the building. Specifications can account for durability, access to spare parts and the ability to repair or replace individual components.

Sustainability in Hotel Operations

Operating practices affect whether a hotel delivers the performance anticipated at the design stage. Engineering and housekeeping can agree how guestroom controls should respond to occupancy, while food and beverage teams can plan production around reservations, covers and events. An increase in overnight water use may prompt a leak check, and an unexpected rise in electricity demand may justify reviewing plant schedules or control settings. Each department should know which figures it is responsible for reviewing and how to raise a problem that involves more than one team.

The layout and servicing arrangements can make these routines easier or harder to maintain. A hotel with substantial banqueting needs practical space for deliveries, food storage and waste separation, as well as collection arrangements that work during busy periods. Tracking food waste alongside covers or events helps the team assess whether a rise reflects additional business or changes in purchasing, production or portioning. The same attention should extend to other areas, including packaging, replacement of furniture and fittings, and the ability of local contractors to handle separated waste.

Laundry and Outsourced Services

An on-site laundry requires space, plant, utility capacity, maintenance support and enough staff to handle peak demand. Outsourcing changes those requirements and introduces others, including space to sort and store linen, suitable loading access, transport and procedures for late or missed collections. The owner should compare the total cost and operating implications of both routes using realistic linen volumes, local tariffs, supplier charges and service standards. The exercise should consider busy periods and disruptions as well as the normal weekly schedule.

Outsourcing also changes where water, energy and other resources are used. At tender stage, the hotel can ask suppliers what information they can provide on the weight processed, delivery arrangements and, where available, energy and water use. Those figures can support a wider assessment of the service, alongside turnaround times, damaged linen and rewashing. For an on-site laundry, linking meter readings to the weight processed and the amount sent for rewashing can help the operator identify whether performance changes are due to volume, machinery or working practices.

Employees, Suppliers and the Destination

Employment conditions are influenced by decisions made before the hotel recruits its first staff. Staff changing and dining areas, accessible routes, and working conditions in kitchens, laundries, and service areas should be considered when establishing the space programme. Future department heads can help the design team identify problems such as awkward trolley routes, heat build-up or insufficient storage before those issues become expensive to correct. During procurement and pre-opening, the owner and operator should also set expectations for contractors, recruitment, and staff training.

A new hotel can increase demand for transport, water and waste collection while creating opportunities for employment and local suppliers. Early discussions with the community and relevant service providers can reveal concerns that are difficult to see from a site plan or a feasibility spreadsheet. Where the operator wants to buy locally, it should consider whether tender sizes, delivery requirements and payment terms allow smaller suppliers to participate. Any commitments the development makes should be reflected in operating budgets, purchasing procedures and reporting after opening.

The Investment Case for Hotel Sustainability

An investment appraisal should start with a clear comparison between the proposed improvement and what the owner would otherwise do. For an existing hotel, that might mean continuing to operate serviceable plant for several years, replacing equipment at the end of its life or undertaking a larger refurbishment. The calculation should include installation, commissioning, maintenance, consumables and any loss of operating contribution during the work. Testing occupancy, utility tariffs and the life of the equipment can show whether the investment still works when trading conditions differ from the base case.

The Business Case for Sustainable Hotels, developed by the World Sustainable Hospitality Alliance with the International Finance Corporation, includes a laundry example. A survey at one property found frequent rewashing at high temperatures, and a two-month trial was used to project potential annual savings across a 70-property portfolio. The figures were projections based on the trial. For an owner considering a similar change, the example shows how a property-level investigation can inform a larger investment, especially when it records linen volumes, rewashing, resource use and service quality.

Illustrative Investment Appraisal

Consider a full-service hotel comparing a higher-efficiency laundry plant with a standard replacement. The higher-efficiency option costs an additional €120,000, including installation and commissioning. It is expected to save €25,000 a year in utility costs and add €5,000 a year in maintenance, producing an annual net saving of €20,000. That gives a six-year simple payback and, assuming ten years of savings received at each year-end and discounted at 8%, a net present value of approximately €14,200.

The illustration assumes steady annual savings and excludes tax, financing cash flows and residual value. The 8% discount rate is illustrative and should be replaced by a rate appropriate to the project and the cash flows being modelled. The owner should also check whether the hotel will process enough linen to support the projected savings and whether the equipment will need further investment during the appraisal period. Where the hotel is leased, or the service is outsourced, the owner should establish how much of the saving it can expect to receive under the applicable agreement.

MeasureIllustrative result
Additional capital expenditure€120,000
Annual utility savings€25,000
Additional annual maintenance costs(€5,000)
Net annual operating savings€20,000
Simple payback6 years
Appraisal period10 years
Illustrative discount rate8%
Net present valueApproximately €14,200

Stranded Asset Risk in Hotels

A hotel can remain open and profitable even as some of its future investment options narrow. Stranded asset risk arises when changes in market expectations, building requirements or operating costs threaten the hotel’s value and the cost or difficulty of adapting makes it hard to recover that value. An older city hotel, for example, may need substantial work to its heating and cooling systems at the next refurbishment, while limited plant space or electrical capacity makes the work more expensive and disruptive. If the same deficiencies also restrict the brands willing to take on the property or increase the capital allowance a buyer requires, the impact can already be reflected in the hotel’s value while it is still trading.

Owners should consider this risk when acquiring a hotel, preparing a long-term capital plan or deciding whether to defer major works. The assessment should identify what needs to change, when the expenditure is likely to fall due, whether the hotel can trade during the work and how much useful life the upgrade could add. It should also consider who is likely to buy the hotel at exit, since some investors may require evidence of energy and carbon performance, a specified certification or a credible plan to meet their sustainability criteria.

If the property falls short, the buyer pool may narrow, and buyers willing to take on the work may reduce their offers to allow for capital costs, disruption to trading and the risk of overruns. The owner can then compare a phased retrofit, a more extensive refurbishment and continued operation under the existing specification, allowing for differences in trading performance, future capital expenditure and exit value. Where practical options are limited, the findings should inform the acquisition price, the timing of reinvestment or the decision to reposition the property.

Measuring Performance, Certification and Reporting

A hotel should track absolute consumption alongside measures that relate consumption to activity. Water use per occupied room can improve while total water use rises as the hotel gets busier, and a busy conference programme can increase consumption without a corresponding increase in room nights. The asset manager needs both perspectives to understand operating efficiency and the hotel’s overall demand on resources. The report should record material changes to hours, facilities, occupancy or sourcing arrangements so that comparisons between periods can be interpreted properly.

Certification should be chosen with a clear understanding of what is assessed, when the assessment takes place and who will use the result. A building certification may be relevant to the design and construction of a new hotel, while an operating standard can assess practices at a property in use. Corporate environmental, social and governance reporting may aggregate information across several hotels and use boundaries that differ from a property-level assessment. Before committing to a scheme, the owner should identify the evidence needed, who will maintain it and whether performance must be checked again after opening.

Using Hotel-Specific Measurement Methods

The Alliance’s Hotel Carbon Measurement Initiative (HCMI) helps hotels calculate the carbon footprint of stays and meetings within a defined scope. Its Hotel Water Measurement Initiative (HWMI) provides measures of water use per occupied room per day and per unit of meeting space per hour. The Hotel Waste Measurement Methodology provides a consistent approach to recording and reporting waste. These methods can help a hotel prepare comparable data for buyers or reporting programmes and give the operator a basis for tracking changes over time.

A hotel also needs data that helps its own teams diagnose problems. A property-level water figure may suit external reporting, while readings for the laundry, kitchens, or irrigation system help the operator investigate the source of a change. In mixed-use developments or hotels with leased outlets, agree how shared consumption will be measured or allocated and keep a record of the calculation. Where the hotel changes a supplier, outsources a service or alters the reporting boundary, it should record that change so readers can see what the figures represent.

World Sustainable Hospitality Alliance

World Sustainable Hospitality Alliance Website

The World Sustainable Hospitality Alliance brings together hotel companies and organisations involved in developing, financing, supplying and operating hotels. Its purpose is to coordinate work on environmental and social issues that affect the industry across markets. This includes developing shared measurement methods, publishing guidance and supporting programmes that hotels and their partners can put into practice. For developers and owners, its work is particularly relevant where building performance depends on decisions made by several parties over the life of the property. 

The Alliance’s hospitality members include Accor, Four Seasons, Hilton, Hyatt, Iberostar, IHG Hotels & Resorts, ITC Hotels, Marriott International, Radisson Hotel Group, Scandic and Wyndham Hotels & Resorts. Its wider membership includes real estate owners, investment funds, technology companies, procurement specialists and professional advisers. That mix reflects how the industry works, with ownership, development, branding and day-to-day operations often handled by different organisations. When evaluating an individual hotel, buyers and owners should look at its measured performance and operating practices alongside any commitments made at group level.

What the Alliance Works On

The Alliance’s Pathway to Net Positive Hospitality provides a framework for hotels at different stages of developing their sustainability programmes. Its themes of people, planet, place and prosperity bring issues such as resource use, biodiversity, labour practices and the hotel’s relationship with its destination into the same discussion. An operating hotel can use the framework to assess its current practices and agree which issues need attention first. A developer can use it at feasibility to identify commitments that will affect the site, the building brief or the operating model.

The Alliance also publishes work aimed at particular groups within the industry. Its Business Case for Sustainable Hotels, developed with the International Finance Corporation, includes separate recommendations for investors and asset managers, owners and developers, operators, and franchisees. This distinction matters because the party paying for an upgrade may be different from the party receiving the operating savings. Where that happens, the owner and operator can use the guidance to discuss capital budgets, access to consumption data and how the benefits of an investment will be reflected in their commercial arrangements. 

Tools and Resources for Hotel Projects

The best-known measurement resources are the Hotel Carbon Measurement Initiative, the Hotel Water Measurement Initiative and the Hotel Waste Measurement Methodology. The carbon and water tools give hotels a basis for reporting comparable figures for stays and meetings within each method’s scope. The waste methodology helps properties collect and report waste data consistently. These tools can inform operating reports and responses to corporate travel buyers, while a developer can use their data requirements to plan what the hotel needs to record from opening. 

The Alliance’s environmental performance guidance and Pathway progress tracker can also help owners establish a baseline and decide where to focus effort. For an existing hotel, this may involve checking whether utility records, occupancy figures and waste collection data are complete enough to support a useful comparison. For a new hotel, the team can agree the meters, records and supplier data it will need before the building is handed over. The owner and operator can then use the first year of trading to compare actual results with the development assumptions and identify issues that merit further investigation. 

Who Is Responsible at Each Stage?

The owner should establish the project’s sustainability requirements and approve the capital allowance, while the design team turns those requirements into specifications and performance criteria. The operator should provide assumptions about service levels, hours, staffing and maintenance before the brief is fixed. At handover, the project and operating teams should verify that the systems function as intended and that hotel staff can obtain and use the information they need. Seasonal checks after opening can help identify issues that commissioning at one time of year may miss.

The relationship between owner and operator is especially important when one party funds an improvement and another pays the operating costs. In a leased hotel, for example, the owner may pay to replace the central plant while the tenant benefits from lower utility bills. That allocation can affect how willing each side is to fund, maintain or upgrade the equipment. The hotel management agreement, lease or related arrangements should address the relevant approval rights, access to performance data and responsibility for operating and capital costs.

Decision or deliverableWho normally leadsHow it is checked
Site constraints and feasibility baselineOwner and feasibility team, with technical advisersUtility availability, operating assumptions and site constraints reviewed before the concept is approved
Design targets and system selectionDesign team, with owner approval and operator inputOption comparisons, design calculations and coordinated specifications
Equipment and supplier commitmentsProject and procurement teamsTender comparisons, agreed performance criteria and supplier reporting requirements
Commissioning and pre-opening trainingCommissioning team and operatorWitnessed tests, meter schedules, training records and an agreed process for resolving defects
Operating performance and corrective actionOperator, reviewed by the asset managerRegular reports, investigation of material variances and agreed actions
Refurbishment and replacement planningOwner or asset manager, with operator inputCapital plan informed by equipment condition, measured performance and the timing of future works

Bringing Sustainability Into the Development Process

The owner should agree on the main sustainability priorities during feasibility and carry them through the design brief, procurement specifications and pre-opening programme. At each stage, the team should be able to identify the decisions the priority affects, the cost already allowed for, and the evidence needed before proceeding. If the concept changes, the implications should be reviewed while alternatives are still open. Adding a spa or a larger banqueting operation, for example, may change plant requirements, staffing, peak water demand and the investment case at the same time.

After opening, the owner and operator should review actual performance against the assumptions made during development. The first full operating year can reveal where the business mix differs from the feasibility study, where equipment needs adjustment and where further investment is justified. Those findings should feed into operating budgets and the annual capital plan, particularly as the hotel approaches a refurbishment or equipment replacement. In this way, the sustainability brief becomes part of how the hotel is developed, managed and reinvested in throughout its operating life.


Further Resources:

See HDG – Climate Change in Hotel Development

See HDG – Environmental Design in Hotels

See HDG – Hotel Insurance

See HDG – Hotel Security Consultants | Risk, Certification & Safety Standards

See HDG – Reputation Management

See HDG – Artificial Intelligence – AI in Hospitality

World Hospitality Sustainability Alliance – Climate Action 

^^^Return to Top of Page^^^